Monday September 4, 2006

 

 

New Carpet and Chairs for Harbor Light Chapel, Harrisburg, PA

 

But first – the old carpet had to be removed

 

2.JPG

Grandsons Nathan and Josh do some of the heavy work.

 

2 (1).JPG

Josh, Nathan, and Jordan on carpet removal duty on Friday afternoon.

 

Today Was Carpet Installation Day

 

2 (3).JPG

How many carpets are measured and cut on truck stop blacktop?

 

2 (4).JPG

David High (background) and Lloyd Nolt are the best!  They always donate their time to install carpet in our local chapels.

 

2 (6).JPG

David working on the carpet.

 

My Participation Began This Morning at 9 AM

 

Because Cerwin could not fit fifteen new chairs and the carpet into TFC’s pickup truck, he asked if I would bring the chairs to the chapel about 9:30 or 10:00 this morning.

 

2 (7).JPG

It was a beautiful morning, and just as I was preparing to leave for the thirty-mile trip, I noticed that Eli was cutting corn, and couldn’t resist taking a picture.

 

2 (8).JPG

I love traveling through Hershey, PA – The Sweetest Place on Earth – with Hershey-Kiss-lined streets.

 

2 (9).JPG

Unique street lights.

 

2 (10).JPG

When I got there, I found Cerwin and Volunteer Chaplain Harold Keller cleaning the newly installed carpet.  Cerwin said Lloyd and David left about three minutes earlier.

 

 2 (11).JPG

Harold sweeping the new carpet.

 

DSCN1040

This is one of the new chairs.  I forgot to take a picture after they were in the chapel.

 

2 (12).JPG

While dusting some areas close to the floor, I noticed something pretty – the American flag – framed in the doorway.

 ~~~

After getting home, Cerwin mowed yard and I worked in flower beds.  It was a good day for that – after two days of rain – the soil was great for pulling weeds.

 

 

This entry was posted in Uncategorized. Bookmark the permalink.

4 Responses to Monday September 4, 2006

Leave a Reply

Your email address will not be published. Required fields are marked *