Progress Report on Exterior of TFC Chapel Under Construction.
February 2006
Removing the back doors of the trailer is one of the first jobs in converting an ordinary freight trailer into a chapel.
This is the first chapel being built in the new Transport For Christ shop, Marietta, PA. The office and shop were built in 2005. Cerwin is delighted to have enough room for two trailers.
Early March 2006 – A solid wall has replaced the back doors…
…and openings have been made for two others. The one above is the entrance door, and the one on the other side is basically used as an emergency exit.
There are openings for two air conditioners – one at each end.
April 12, 2006 – Before sandblasting
April 19, 2006 – After sandblasting and primer paint.
April 26 – The paint job is complete and lettering has begun.
Cerwin had to take something to the sign shop yesterday and was pleased to have his camera along and capture a photo of a workman in the early stages of lettering.







2 Responses to Thursday April 27, 2006