Friday August 11, 2006

 

The Rest of Our Day

1.JPG 

Conducting business from my outside office.

 

1 (1).JPG 

Bill Rumpf preparing for the door’s replacement.

 

1 (2).JPG 

The reason the door needed to be replaced.

 

1 (4).JPG 

Removing the old door.

 

1 (5).JPG 

Chaplain Earl picking up the pieces.

 

1 (9).JPG 

Installing the new door.

 

1 (10).JPG 

 

1 (11).JPG 

 

1 (8).JPG 

 

1 (6).JPG 

Colleen (Chaplain Earl’s wife) checks out her new camera.

 

1 (7).JPG 

The Supervisor

Earl and Colleen’s dog Muffin kept a close eye on everything and everyone.

 

1 (13).JPG 

Earl spent some of his day visiting drivers.

 

1 (12).JPG 

Bill & Cerwin take a break.

 

1 (14).JPG 

After the sun was no longer beating down on the eastern side of the chapel, I decided to polish some of the dull paint.

 

1 (16).JPG 

After the door was installed, the men began putting new trim on a window.

 

1 (17).JPG 

 

1 (18).JPG 

Cerwin was so impressed by what was happening when I polished the exterior, that he joined me when he was finished with all his projects.

It was a good day – and the chapel looks so much better.

~ ~ ~

Tonight I am grateful for a hot shower and comfortable bed in the motel across the street.

 

This entry was posted in Uncategorized. Bookmark the permalink.

4 Responses to Friday August 11, 2006

Leave a Reply

Your email address will not be published. Required fields are marked *