Thursday February 22, 2007

 

 

New

Transport For Christ Chapel

Under Construction

This one will be placed at Pilot Travel Center, 699 State RT 203, East Saint Louis, IL.

 

2-7-07.JPG

The first thing Cerwin did was empty the two bay garage. 

The Promotional Chapel (based out of this location) and Life-Saver Chapel (waiting to be moved to Elkton, MD), were pulled outside and parked beside two other trailers waiting to be transformed into chapels.

 

2-7-07 (2).JPG

Then this 48′ Budd trailer was backed inside.

 

2-7-07 (5).JPG

First job – removing the back doors.

 

2-9-07 (1).JPG

Glenn Fahnestock removing a door hinge.

 

2-19-07 (1).JPG

The “naked” interior is ready for a makeover.

 

2-21-07 (5).JPG

Earlier this week, openings were cut for the window and two doors.  This door is located in the office/living quarters, and will be used for an emergency exit only.

 

2-20-07.JPG

Bill Rumpf, Philadelphia, PA, and Chaplain David Hertle, Omaha, NE (helper for a day) assemble a floor section.

 

2-20-07 (1).JPG

Don Hollinger, Lititz, PA, assists with a floor section.

 

2-20-07 (2).JPG

Bill, Dave, and Donald enjoy a coffee break.

 

2-21-07.JPG

The next step – insulation for the floor.

 

2-21-07 (1).JPG

Ted McCoy, Lititz, PA, and Cerwin measure for the last section of plywood.

 

2-21-07 (8).JPG

I took this photo yesterday, just after the guys had begun putting up wall sections.

 (to be continued as construction progresses)

 

 