Tuesday May 3, 2011

Painting the Garage

Wednesday, April 27 to Saturday, April 30

 

1 (1)

One of Cerwin’s first jobs was to remove this shelf and fill in areas where something – or someone – made a dent or hole in the wall.

We have been talking about painting the garage walls and floor for the past few years – and we finally did it.

 

 

1 (3)

We removed the old lights before painting the ceiling.

 

 

1 (6)

The trap door with a rope (foreground) is our entrance to the attic.

 

 

1 (17)

We changed the ceiling and wall color from light blue to ivory.

 

 

1 (19)

 

 

1 (22)

I did the trimming and painted areas where the roller did not fit.

 

 

1 (25)

 

 

1 (28)

 

 

1 (29)

By Saturday morning we were ready to paint the floor.

 

 

1 (32)

Painting the floor was long overdue.

 

 

DSC_0006

Look at the difference. Everything looks so clean.

 

 

DSC_0007

We also installed new light fixtures.

 

 

2 (3)

My favorite new thing is that Cerwin used paneling to make doors for what was open shelves where he stores all kind of things – electric cords, jumper cables, things for cleaning and waxing our cars, plus buckets. It is also where we keep quoits, horseshoes, and bocce for the pavilion area. (You can see a bit of it on the second photo – on the right.)

When we get everything back where it belongs, I want to clean the carpet in the back room – hopefully this week.

 

 

This entry was posted in Uncategorized. Bookmark the permalink.

10 Responses to Tuesday May 3, 2011

Leave a Reply

Your email address will not be published. Required fields are marked *