Monday March 22, 2010

 

 

Indianapolis Chapel Construction

…since March 1

 

 

1.jpg

Jordan laying floor insulation

 

 

1 (1).jpg

Glenn attaching a piece of plywood to the floor 2 x 4’s

 

 

2.jpg

Cerwin, Glenn, and Jordan preparing to lay the next piece of plywood.

 

 

2 (1).jpg

Cerwin putting glue on a floor joist.

 

 

2 (2).jpg

Laying the next piece of plywood

 

 

2 (3).jpg

 

 

3.jpg

Wall sections

 

 

4.jpg

Glenn working on exterior side of the back wall (where trailer doors had been)

 

 

4 (1).jpg

Interior of the same wall

 

 

4 (2).jpg

The back wall is installed

 

 

5.jpg

Wall and ceiling framework is finished

 

 

5 (1).jpg

Standing in the living quarters, facing the chapel area

 

 

6.jpg

Rough wiring

 

~~~

The goal is to have the chapel completed by late spring or early summer.

~~~

 

 