TFC Chapel Construction Update

And a Repaired Sign

 

I thought it was time to give you an update on what is happening with the chapel that Cerwin is building for Racine, Wisconsin. 

You may remember that TFC put a hold on chapel construction for a few months due to lack of finances, then at the end of the year, we received a donation that was designated especially for the completion of the chapel. 

 

 

1.JPG

When Cerwin is ready to do the trim, he always calls in Karl, who is a finish carpenter.  He faithfully volunteers a few hours for each chapel.

 

 

1 (1).JPG

Cerwin says that what Karl does in a few hours, would take him a few days – especially if he had to do the crown molding.

 

 

1 (2).JPG

Thanks Karl.

 

 

1 (3).JPG

Before long Cerwin was ready to have the carpet installed.

 

 

1 (4).JPG

 

 

1 (5).JPG

 

 

1 (6).JPG

For this job, he also calls in professionals.

 

 

1 (7).JPG

Lloyd and David get this job done is short-order.  They have installed carpet in many of TFC’s chapels.

 

 

1 (9).JPG

Chapel area

 

 

1 (10).JPG

Facing the living quarters

 

 

1 (11).JPG

In the living quarters

 

 

1 (12).JPG

Howard Moses, TFC Director of Chaplain Care, is also a commercial electrician.

 

 

1 (13).JPG

Not all electrical work can be done in a standing position.

 

 

1 (14).JPG

The other day we stopped at the sandblaster to see if he is ready for the chapel on Monday.  (He is ready.)  I watched one of his workmen sandblasting a vehicle while Cerwin talked to Amos.

It should be ready for the trip to Racine by the end of April.  I am so anxious to help deliver another chapel.

 

~~~

Repairing the TFC Sign

~~~

 

1 (15).JPG

If you read my blog on a regular basis, you will remember that the headquarters entrance sign was destroyed on Christmas Eve by a young driver.

 

 

1 (16).JPG

Cerwin recently picked up the repaired sign, and a masonry contractor rebuilt the damaged pillar.  Cerwin was glad to have Glenn help him put the sign in place.

 

 

1 (17).JPG

It looks so nice again.

(The last two photos were taken by Inge, TFC Executive Assistant to the President.)

 

 