Chapel Construction Update

Construction on the chapel for Houston, Texas – June 21 to 30

6-21-16 (1)June 21 – our grandsons Jared and Ian helped install the insulation.

6-21-16 (2)

6-21-16 (4)

6-21-16 (5)They also assisted with the ceiling.

6-21-16 (8)

6-23-16 (1)June 23. Dave posing for the camera while the others work. 🙂

6-23-16 (3)

6-28-16 (1)June 28. Cerwin picked up the steps at PBZ Fabricating.

6-28-16 (2)

6-28-16 (3)The cabinets arrived that day as well.

6-29-16 (1)June 29. Preparing to install paneling. After placing the paneling on the wall then removing it, this marks the spot for cutting an opening for the electrical outlet.

6-30-16 (2)June 29. Glenn cutting an outlet opening.

6-30-16 (1)Paneling – the living quarters.

6-30-16 (3)

6-29-16 (2)The chapel area at the end of June.

6-30-16 (4)As you can see by the previous picture, the paneling is all the same color and style. Shadowing makes the end of the chapel appear darker in this photo.